Spring is coming: Vertec’s PV system was installed in September, since then the electricity production had dropped everyday as we entered winter, but things are changing … So far this month (6th March) the 120 PV panels on the roof of our offices have produced 336kWh which is the same as the whole of December. That’s around 4-5 full charges for Vertec’s electric cars.
Still a long way to go to become self sufficient but it’s a start.